Doña Montaña. Public Sculpture
Doña Montaña. Public Sculpture.
Bienal de Arte de Medellín y Antioquia. 2025
This sculpture, through its location and scale, not only inhabits the public space but also activates a group of sculptures created previously
in connection with a civil engineering work: the construction of the José María Córdova Airport in Rionegro (1979–1985).
Based on this link between progress and culture—or, in other words, between civil engineering and sculpture—the Túnel de Oriente
(Eastern Tunnel) is proposed as a case study and intervention. Due to its length and complexity, it constitutes a key infrastructure for the
development of Medellín, Rionegro, and the department of Antioquia.
The use of materials extracted during the excavation, mainly intended for paving, structures, and land fills, gives rise to one of the central
concepts of the sculpture: if progress—or, more precisely, major engineering works—generate sculptures, then the materials resulting from
the Túnel de Oriente project should also produce one. In this case, the stone from the mountain becomes the constitutive material of the piece.
Within this context, a second and definitive concept emerges: the geologists and engineers involved developed a specific relationship with
this territory. The mountain ceased to be an abstract geographical feature and became a singular entity defined by work, time, and experience.
From this relationship arose the phrase "es que esta es una señora montaña" ("this is truly a grand mountain"), which gives the sculpture its
name: Doña Montaña.
Unlike other infrastructure projects, a tunnel does not add volume to the landscape; its operation consists of excavating space within the
mountain. Paradoxically, its shape references what it crosses: the mountain itself. The engineering work, that is, the tunnel and the mountain,
is abstracted and geometrized. The sculpture is then configured as an echo of this condition: it establishes a direct relationship with the
intervened mountain and pays tribute to both the engineering work and the geography that made it possible.
The mountains of Antioquia have been a condition for progress; without them, neither engineering nor Antioquian culture would have existed.
This work is dedicated to the civil engineers of Antioquia and, in particular, to my great-grandfather, the engineer Juan de la Cruz Posada.
PABLO GÓMEZ URIBE. 2026
Medium: Habitable and Public Sculpture
Dimensions: 23 m x 15 m x 7.5 m height
Materials: Sheet iron (ASTM A572 Gr50), primed and coated paint, zinc phosphate epoxy barrier. Aliphatic polyurethane finish RAL 3005.
Gneiss stone, granite slabs. Patula pine trunk, Yarumo tree, weeds, Teak wood.
Location: José María Córdova Airport Interchange, Rionegro, Antioquia.
Work Teams
Pablo Gómez Uribe– Leader
Maria Alejandra Duque Patiño – Project Director
Maria Fernanda Duque Garcés – Scale Models and Drawings
Juan José Villegas Arboleda – 3D Visualization
Isabella Duque Garcés – Scale Model
Maleza – Landscaping Proposal
Luisa Lara
Isabel Villegas
Maria Camila Henao
Carolina Mejía
Structural Calculations
Marín Uribe – Structural Engineering
Metallic Structure Construction
Mincivil
Resident Engineer: Camilo García Vianna
Civil Works Construction
Concesión Túnel Aburrá Oriente – Odinsa
Lead Engineers: Andrés Villegas and Isabel Gutiérrez
Photography
Alejandro Arango
Support / Sponsors
Odinsa
Concesión Túnel de Oriente
Gobernación de Antioquia
Proxyco Gallery
Alexa Halaby









